The Jinzhao Photovoltaic Power Station Project is located in Guangxi Zhuang Autonomous Region, with an installed capacity of 20MW and an overall planned land area of 800 acres.
The project has a static total investment of 150 million yuan and started construction in May 2018. It was fully connected to the grid for power generation on December 30, 2018.

After the completion of the project, the first year of online power generation was 29.0797 million kW · h, with an annual power generation hour of 1176.82 hours. The average annual electricity consumption during the entire 25 year economic life cycle is about 26.1245 million kW · h, reducing carbon dioxide emissions by 260500 tons.
400MW Photovoltaic Power Generation Project in Qinnan District, Qinzhou City

The total planned installed capacity of the project is 400MW, and the project location is located in Qinzhou City, Guangxi Zhuang Autonomous Region. The center of the proposed site is located at 108.74 east longitude and 21.70 north latitude, with an elevation of about 20 meters.
The available land area of this project is 10000 acres, with a total investment of 2.6 billion yuan. Construction began on May 1, 2020. On December 19, 2020, the # 1 main transformer was successfully powered, and on December 20, the photovoltaic array began grid connected power generation.
On December 30, 2021, after full grid connection of the full capacity grid connection project, the first year’s online power generation was 611.9464 million kWh, with an annual power generation hour of 1176.82 hours. Throughout the entire 25 year economic life cycle, the average annual online power consumption was about 54.964 million kW · h, reducing carbon dioxide emissions by 5.48 million tons, and generating an annual profit tax of 92.5 million yuan. Within one year of 2021, a photovoltaic grid connected capacity of 360MW was achieved. Created the highest grid connected capacity of individual photovoltaic projects in China this year“